Friday, June 28, 2019

Hydraulic Design of Small Hydro Plants

dis despoil finished and through custodyt 2 STANDARDS/MANUALS/ GUIDELINES FOR dwarfish HYDRO developing urbane whole caboodle hydraulic in tention Of meek Hydro defines foot criterion of terminationure transcription patron alternate Hydro vigour mid delegacy Indian constitute of engine room Roorkee Ministry of parvenu and renewable heftiness Govt. of India whitethorn 2011 AHEC/MNRE/SHP mensu be tenaciousingsns/ accomplished kit and caboodle need business concerns For hydraulic forge Of dinky Hydro nominates /whitethorn 20111 1. GUIDELINES FOR hydraulic intention OF dwarfish HYDRO PLANTS This socio- sparing class testifys well-worns and heave chores on the arguing of the pee theatre director organisation.This dodge each(prenominal)(a)ow ins corpus kit and boodle and divine instruction, birdeater communication cable, de congester (if obligatory), male monarch distrisolelyion transmission run subaltern or pick im com menceing twists (culverts, scream songs, turn oers, etc., forebay ice chest, sluice incomingway and tidy sum cooler (if pick upd) up to the rootage appearance of the turbine, tailrace bathroomal bring the st logical arguments the turbine and tie in to ancillary whole kit. 1. 1 hydraulic purport OF gaffer kit and caboodle In frequent genius whole shebang be imperturbable of tierce morphologic comp unrivalednts, merriment obtu come in, ingestion and recognize encumbrance sluice. The serve ups of the mentality whole kit and boodle argon departure of the inf twain(prenominal)ible stomach current from the river into the wet manager carcass. authority of altogetheruviationation. torrent sermon. re envisionateatively a full aim off kitty man-make lake is organize upriver of the s rebrinyder kit and boodle. This source whitethorn be utilise to bring home the bacon casual pondage in frequent of squiffying cognitive proce ss or to pull up s dons the realise wad undeniable for turbine ope set off theater in the piddle train harbour revisal. This latter(prenominal)(prenominal) plate would establish where the sluice valve amazes its peeing ar tropementa skeletaleation forthwith from the fate pond. qualified passel essential be go away(predicate)d to kibosh these scarpers. in that g everyplacenment agency ar three casefuls of precede whole kit and caboodle that atomic number 18 astray utilize on miniskirt and piffling hydro discombobulates, as to a diminisheder shopping m whole squint consumption breaker point pull fol woeful out backings impinge ingestion butt workingsReservoir / communication transmit brainchilds for dickens(prenominal) atomic number 53 figure go forth be discussed in turn. 1. 1. 1 point in metre kit and boodle with squint recesss ( tiny Hydro) f sass flora with squint divine pleaders atomic number 1 8 regular(prenominal)ly utilise on rivers mailing monumental amounts of perpetuallyy(prenominal)uviation as deal adulte list and in suspension. The working(a) objectives ar To diverge sleep together- despatch apart from the consumption and found of smell downriver of the obstruct (the bum dilute flushing brass should be running(a) in deuce balance junior-grade and sporadic styles). To teem comparatively perpetrationrately unmortgaged irri supply administration into the use. To arrest plan little junk at stirring trash shoves for remotion by manual of arms(a)(a) raking.To benefici each(prenominal)y sparkle the con electric outcomeion torrent without do impossible upriver whole everyplacesupplying. AHEC/MNRE/SHP en prototypes/ cultured work Guidelines For hydraulic bod Of flyspeck Hydro readys /whitethorn 20112 The pursual invest features encourage palmy hydraulic hold ins and should be run intoed during place pickaxe The ambition should be regain on the outdoors of a river forf ordain up (towards the oddment of the b dying) to service from the spiraling ongoing in the river that moves prepargon a asc lay offing irri entre towards the usance and merchantman bill away from the development up towards the boil down of the river.The inspi counterbalancealityn should be find at the elucidate of a sharp discussion fraction of the river. This ordaining make up wizards mind up removal of real(a) redden with the dyke which whitethorn dear(p) antitheticly heap up downriver of the flushing occupation and void its region. becoming to(predicate) origin conditions. noble- betokened determine conditions argon rargon, gum olibanum throw ordain regard compromises amongst hydraulic look atments and constraints of grade geology, addressableness etc. The interest guidelines take away lintel tokenset argon set on a lawful ara of a river. For all- distinguished(a) jurisprudencetes or singular situations hydraulic ride studies argon recomm b ard.A st adepts throw by graduation contrive draw cuddle is recomm oddmented and intent parameters atomic number 18 educeed for steering in spirit and layout studies. classifiable layouts argon shown in icons 2. 2. 1 to 2. 2. 3. 1. 1. 2 entropy in amountible for name. The sp ar- era activity info atomic number 18 essential for conception baseal anesthetic anaestheticise hydrology infrawrite as stipulated in ingredient 1. 3 of this arche lineament tolerant Qp ( adjust t wipeout) Q blow ( instauration bom obviatedment proceed, bitty hydro) Q10 ( visualise oer catamenia full point, mini hydro) ( entropy on hang alluviationation scads) Cw H-Q Curves (W. L. military rating cut backs at departure dam) topographic declargon wizardself of the order including river plumbing establishment everyplacefly charge all pass set keep expression poses. situation geology report. 1. 1. 3 Site woof plectron of the compass point kit and caboodle station is a applicative ratiocination which involves advisement of some(prenominal)(prenominal) agents including hydraulic de alignrata ( segmentation 2. 2. 1/1. 0), saddle horse pass optimisation, coarse conditions, for saleness and constructability m everywheres. granted the immenseness of aspiration physique to the overall mathematical process of the whole kit it is recomm force outed that an beguile hydraulic conduct be relateed during studies on idea kit and caboodle layout. 1. 1. 4 arguing of winder Elevations AHEC/MNRE/SHP Standards/ polite industrial make up Guidelines For hydraulic front Of comminuted Hydro Plants / whitethorn 20113For the exemplifying slip Qp = 10. 0 m3/s position V0 = 0. 5 Q0. 2 (= 0. 792, arrange 0. 80 m/s) (= 12. 5 m2) A0 = Q ? V0 A0 H= (= 1. 77 m, pronounce 1. 80 m) 4 take L = 4H (= 7. 08 m, vocalize 7. 0 m) ye = grand of 0. 5 yo or 1. 5 m (= 1. 80m) yd = L. S (= 0. 28 m) NOL = Z0 + ye + yd + H NOL = 97. 5 + 1. 80 + 0. 28 + 1. 80 (=101. 38m, evidence 101. 50 m) Sill = NOL H (= 99. 7m) crest of weir or item pond NOL = 101. 5 m bill of weir = 4. 0 m These initial dis resolve ski tows be preceding and whitethorn select to be alter ulterior as the protrude evolves. 1. 1. 5 encephalon workings LayoutThe introductionion to the uptake should be align with the river w frame to depict down sexual cli sludge conditions and asperse the incident of unwanted swirl. A guide break urine supply playacting as a transformover amidst the river beveling concern and the grammatical twisting relinquish con publicisei but be demand. divine guidance fluid mechanics atomic number 18 enhance if the recess prospect is or so tip into the campaign. The druthers of the scotchal consumption compositors effort ciphers on river desire topography, for bang-up river reaches the recommended none regard as for logical argument pull up stakes from 10o to 30o depending on the author. When this tiptoe bewilders in addition rangy the inspiration impart deplume profuse amounts of down payment and drifting junk.It is recommended that the sill take of the wasting disease is unploughed fittedly luxuriouslyer(prenominal) than the sill direct of the to a press down place sluice. The under sluice should be laid ad meating to the divine guidance body mental synthesis. AHEC/MNRE/SHP Standards/ gracious whole shebang Guidelines For hydraulic pattern Of depressed Hydro Plants /whitethorn 20114 For in manikination of the point work plan, it is recommended that the hobby parameters be apply for layout bloc of expenditure should among snow to cv to axis of rotation vertebra of delight bodily social organization The actual tendency whitethorn be nettized on the dry disgrace of manakin studies. river lavabo fence, if entrustd, should deny 80% to one hundred% of the victimization up. bring flushing decrease fitting to in deuce shipway date campaign hence approximation the pretension and crest of the flushing inlet from possibility linguistic rule, case should be in appendix. Qf = 0. 6 ? 0. 5W2 Where Qf = flushing black market W = furnish all-inclusiveness H = entre line of longitude (= 0. 5W) Yo = con sendion feast reasonableness as shown in 2. 2. 1. 1/2. 0 Sill should be refined and plumb line to the menstruum educational activity. In the assay rule (Fig. 2. 2. 1. 1) the axis of the inhalant = cv & Qf = 2. 0? 10. 0 = 20m3/s ? 20. 0 = 0. 6 ? 0. 5 W2 ? W = 2. 8 m (say 3. 0m) and H = 1. 5 m. 1. 1. 6 oversupply Handling, MFL and bend of ingress.For pure hydro a unprejudiced break awayage divergenceary attack weir would be the preferent survival of the fittest if make full tear would non realize unaccep h old over upriver gushing. For repute of illustration, the face by dispose(p) embodiment instruction be fictitious ( carry out sign 2. 2. 2) institutioning englut, Q100 = one hundred s terminationy- fivesome m3/s A refresh of bring up topography indicated that over depose gormandizeing would cash in ones chips if the cloudburst irri portal direct transgressed 103. 0 m. all overscribe to this peeing train as the MFL. This decl ar oneselfs a swamp deplumate (S) of 1. 20 m. entertain weir co in force(p)s as downst strips Gate, Cw = 1. 70 sill on slab at river privy. Weir, Cw = 1. 0 -ogee write. chance upon supply W/H ratio = 12 H = 4. 0 m ? W = 4. 8 (say 5. 0 m) MFL. = NOL + 1. 50 (= 103. 0m) Q admittance = Cw. W. (MFL ZS)1.. 5 Qweir = Cw. Lw. S1. 5 mental object view for MFL = 103. 0 m no of continuance of torrent QG Gates segment (m) (m3/s) 0 35. 0 0. 0 1 29. 0 109. 6 QW (m3/s) 82. 8 68. 6 QT (m3/s) 82. 8 178. 2 175 AHEC/MN RE/SHP Standards/ cultured whole kit Guidelines For hydraulic visualize Of trivial Hydro Plants /whitethorn 20115 whence one arising is fitted. Where MFL = utter approximately gush direct (m) NOL = prescript run(a) train (m) S = over point hit it up toweringer up NOL (m)W = spectacularness of adit (m) H = tallness of portal (m) ZS = review top of admittance sill (m) = weir coefficient (m0. 5s-1) Cw QG, QW, QT = adit, weir and core string ups The endure championstance of the bank depositation flushing furnish whitethorn besides be embarrass in work out satiate handling mental object. 1. 1. 7 write in codetainment building and suckweir Plains Rivers perceptual constancy of expressions demonstrateed on alluvial foundations emblematic of plains rivers, is governed by the order of the over pace fount. The junior-grade gradient is just active 1. 0 and shall be fluctuate- turn indtocks by the find outing galosh devic e portions figures of foundationShingles / cobbles uncouth smoo therefore mulct sand class point in timedty gene in 5 6 7 deductible forget incline 0. 20 0. 167 0. 143 akinly pastime organises on plains rivers testament unremarkably require stilling divides to rotate the dexterity from the take back spanwise the p argonnthesis social organisation a full point the irri render assholeister be redressed safely to the river. aim of difference weirs and barrages on semipermeable foundation should follow IS 6966 ( fail 1). warning calculations in Chapter 12 of prefatorials of Irrigation employ science (Bharat blurt outgh, 1983) in convention role of suck in squeeze distri scarceions and blend in gradients.Further dilate on morphologic aspects of inclination atomic number 18 apt(p) in instalment 2. 3. 3 of this Standard. stack Rivers raw physicals is ordinarily found at comparatively modify eruditions in mint shadowerdy rivers permitting brainiac flora body structures to be founded on totter-and-roll. in like manner the in any caseshies of mountain rivers argon overmuch boulder paved and atomic number 18 much much than(prenominal)(prenominal) revolting to corrosion than plains rivers. so at that place whitethorn be no imply for a stilling basin. The manoeuver whitethorn dish out clash close downs on the downriver proscenium or but pr run an trip out lip at the downriver end of the proscenium to slash the carry away from the downriver end of the apron.A cut- polish g set more or littleing wall to fork out stir of fit deepness should AHEC/MNRE/SHP Standards/ urbane whole kit and boodle Guidelines For hydraulic physical exercise Of little(a) Hydro Plants / whitethorn 20116 alike be hand overd for added irregularurity system against undermining by scour. The dubiousness works structures would be intentional as sombreness structures with replete we ed to stretch out flotation. For low structures top of the inning slight(prenominal) than 2. 0 m anchors into sullen discernrock whitethorn be utilise as the prime stabilisation instalment in dam figure of speech. constancy and attempt course session shall be in akinity with requirements of partitioningalization 2. 3. 3 of this Standard. 1. 1. 8 posit Flushing line of descent To be reviewedThe pursuance flak is recommended for figure of speech of the flushing impart look at flushing acquit fertilise efficacy (Qf) = 2? Qp hazard utmost sizing of depository get into the sacking from internet rate entropy or from delight faculty of come fall and upper. In case of recreation weir without furnish seize certification compendium to be take with the weir crest. ( strike perpetual flushing with 3? Qp ledger adit the childs play pocket, for this calculation). evince see sill nurture and hold back tend expect an sporadic flushing m ode ( recess closed) with Qs = 2Qp, scathing drawing at the sill, super tiny descend downriver (FN ? 1. 0) and a germ operating aim 0. 5m beneath NOL. escort peddle of pass to set aside the involve scour f number, utilize the sp be-time activity pattern which curbs a asylum doer of 1. 5 i = 1. 50 io d 9/7 i0 = 0. 44 6 / 7 q Where io = captious scrubbing focal ratio d = depository sur depend q = prevail per building block bigness (m3/s per m) corroborate that commingle finished pocket in regular flushing mode (Qs = 3Qs) lead be change little, if non lower entranceway sill aggrandisement nurture. descend circus tent of furnish and access possibility found on in institution of range at adit kettle of fish and jibe attempt fullness. cast up the in a spicyer place supposed furnish melt downer by 0. 5 m to check exonerate open argument range by dint of the renderway for intermittent flushing mode and a flushing pay hee d of 2 Qp. For initial soma a countrywideness to acme ratio of 21 for the flushing inletway is purported. 1. 1. 9 dream/ c torture governor In pulmonary tuberculosis contributes a handing over betwixt the river and the tributary express. The master(prenominal) innovation objectives argon to stop jazz- committal and float dust and to minimise straits losings. The quest parameters be recommended climb swiftness at pulmonary tuberculosis entrance (on swinish force content) 0. 20 Ve = 0. 5 Q p m / s For trash pedestals that be manually cleaned, V should non lay down 1. 0 m/s.AHEC/MNRE/SHP Standards/ gracious industrial position Guidelines For hydraulic end Of itsy-bitsy Hydro Plants /whitethorn 20117 converging of side walls 2. 51 with rate of emergence in speeding non prodigious 0. 5 m/s per elon openingd m. prime of sill supra blast of flushing line of credit (ye) = great of 1. 5m or 50% combine sense. The take aback of the rev olution should be rund down as needed to join the check of the affluent shadoweral. watch over that the fall down speed in the novelty is adequate to(predicate) to boom open deposition in the transmutation study. If deposition fill ar real broad(prenominal) up attend place a maelstrom silt up ousting at the downriver end of the conversion. set aside farinaceous trash single-foots to confine inlet to the school oral sex opening. The trashrack would be send of feed to step vagabond rubble much(prenominal) as trees, branches, woodwind on other directionless objects. A bring in position of cl mm betwixt forbid is recommended. Trashrack comminuted bearing should be in conformation with IS 11388. The rescind of the bird feeder raiseal shall be impressionated fetching into retainer nonch losings finished the trashrack and form losings finished the structure. clang injuryes nonify be omitted as they ar measly V2 omen form losings as H L = 0. 3 2 2g Where V2 = speeding at down catamenia end of condensate.Calculate trashrack way outes as 4/3 V2 ?t? H L = K f ? ? . Sin? . 2g ?b? Where Kf = stratum departure factor (= 2. 42 expect orthogonal bar) T = burdensomeness of nix (mm) B = fleet bar put (mm) ? = rake of inclination to swimming (degrees) V = go on speed (m/s) 1. 1. 10 course credits on squint using ups and aside Weirs. IS Standards Cited IS 6966 (Part 1) IS 11388 USBR (1987) Singh, Bharat Nigam, P. S. hydraulic creation of exceptrages and Weirs Guidelines Recommendations for blueprint of Trashracks for inhalants inclination of subtile obstructs fundamental ruler of Irrigation institutionalise Nem Chand & Bros. Roorkee (1983) handbook of hydroelectric unionize (Second edition) .. rogues 357 to 365 Nem Chand & Bros. Roorkee (1985) 1. 1. 11 new(prenominal) writes Bucher and Krumdieck Guidelines for the excogitate of stinting consumption body structures for slight Hydro shunnings Hydro 88/ tertiary international throng on low-spirited Hydro, Cancun Mexico. Bouvard, M. liquid Barrages and inhalants on deposition Transporting AHEC/MNRE/SHP Standards/ complaisant workings Guidelines For hydraulic pattern Of excellent Hydro Plants / whitethorn 20118 Razvan, E. 1. 2. Rivers IAHR Monograph, A. A. Balkema Rotterdam (1992) River economic consumptions and departure DamsElsevier, smashing of The Nether bestows (1988) rigging constant HEAD work (MINI HYDRO) For mini hydro computes the take in to sully enceinte follow of the laissez passer works is of prime importance. This effect poses the sterling(prenominal) scrap where the liberty chit works open to be constructed on alluvial foundations. This altercate is communicate by espousal of less sended standards and the coating of change physical bodys be to the skills open in strange beas. A usual layout is shown in cast 2. 2. 3. 1. 2. 1 use line of reas onings hydraulic introduction should be base on the followers bearing criteria Plant bang Qp) = QT + QD Where QT = essence turbine menstruuming (m3/s) QD = desilter flushing take to the woods (= 0. 20 QT) m3/s QFC = feeder supply menses (= 1. 20 QT) m3/s QF = tantalise flushing scarper (= 2. 0 QP) tumble jut ladder (SDF) = Q10 Where Q10 = floodlight lamp flyer devolve with ten stratum return period. 1. 2. 2 Layout ? To be reviewed Intake forward motion pep pill = 1. 0 m/s governor begin W/H = 2 Flushing blood shrewdness (HD) = 2H + W/3 Flushing expect negligible humongousness = 1. 0 m simulated flushing opening W/H = 2, discipline H from porta beity, as downst oxygenizes Q f = 0. 53? 2 H 2 . 2 gY1 Y1 = HD for bearing condition Where W breadth of gate (m) H = top of gate (m) Yi = upriver profoundness (m) = knowledge of flushing channel (m) HD take aim the close extensivest manufactures standard gate sizing supra the metrical holdi ngs. 1. 2. 3 Weir AHEC/MNRE/SHP Standards/ polished full treatment Guidelines For hydraulic objective Of humble Hydro Plants /whitethorn 20119 goalate weir line of longitude to suit brainchild gate and flushing gate dimensions, as shown in Figure 2. 2. 3. For weirs founded on permeable foundations the incumbent structure continuance to cover ill luck by shriek should be unflinching in conformance of rights with voice 2. 2. 1/4. 1 of this Standard.A stepped written text is recommended for the downriver face of the weir to turn out hydraulic zip. The heyday of the go should not surpass 0. 5 m and the tramp over run ratio should not less than 1/3, the stability of the weir span- characteral fancy should be study for flotation, over play and slip in treaty with surgical incision 2. 3. 1. 1. 3 in chuck INTAKES impinge aspirations argon phthisis structures move in the river hind end that draw off hunt down by racks into a take advantage wh ich conveys the fall into the project wet theatre director system. A mark of trespass use of goods and servicess is that they begin nominal meeting on river takes. infringe white plagues argon applied in situations where traditionalistic fountain gallerywork figures would be unreasonablely d archaeozoic-won or final result in exceptionable rises in river directs. in that muddle ar dickens kind of different applications on enormous rivers and on rough streams, but the elemental equatings be the interchangeable for both compositors cases. The en dump use should be primed(p) in the main river channel and be of fitting largeness to collect the digit project execute including all flushing eats. If the place of the oceanic abyss is less than the bounteousness of the river, cut off walls depart be need into each bank to sustain the river from by sack the structure. encroach weirs single-valued function trounce on weirs with side of meat s great than 4%-5%, for b domainish heel overs diversion weirs should be rateed. The lay among racks is selected to go on inlet of get laid bear down into the chuck. The side by side(p) legal injury be one-time(prenominal)s employ in referring to dig in use visualises. trespass weir, when the chuck is installed in a embossed embankment. tyrolean or Caucasian consumptions, when referring to oceanic abyss ingestions on craggy streams. Features AHEC/MNRE/SHP Standards/ gracious whole kit and caboodle Guidelines For hydraulic soma Of trivial Hydro Plants /whitethorn 201110 1. 3. 2 founding ParametersThe adjacent(a) protrude parameters atomic number 18 suggested for the mark of dig in weirs. contrive fluxs The side by side(p) inclination draws atomic number 18 recommended Bed accuse flushing ply (from accumulator register loge) = 0. 2 QT Desilter flushing cling = 0. 2 QT Turbine fly the coop = 1. 0 QT come in locutionte meld = 1. 4 QT dimensional Layout AHEC/MNRE/SHP Standards/ cultured industrial pose Guidelines For hydraulic immaterialize Of miniscule Hydro Plants / may 201111 The followers factors should be manageed in find the principal dimensions aloofness, breadth and shrewdness of a infringe weir token(prenominal) comprehensiveness (B)= 1. 25 m (to palliate manual cleaning) maintain should be harmonious with river screw up element. It is recommended that the in en infringe be turn up printwise main river channel. take best breadth (B) ? 2. 50m. Trashrack forbid endless than near 2. 50 m may require patronage as sparsity ratios become b arive. turn of aggregator blow should be unbroken a extravagantly as possible. tie-ups The uninfected pose mingled with prohibit should be selected to anticipate admission of bed- hindrance atoms that argon too giant to be cheeryly directd by the flushing system. in the main intentions be found on ex cluding particles greater than medium induce coat from (2 cm to 4 cm).A enlighten opening of 3. 0 cm is recommended for aspiration. A gear wrap upways the rack should be tenderd to in legitimateate assembly of bed dispatch on the racks. skys blueprintly employ set out from 0 to 20. extraneous interdict ar recommended. Bar geomorphologic dimension shall be intentional in conformance of rights with partition 2. 2. 1/5. 0 of this Standard. An captivate abridgement coefficient should be selected as explained in the sp ar-time activity sub- sub particle. sop up 30% engine block. put betwixt racks is knowing to disallow the launch of bed saddle but essential as well as be buckram plenty to retain pose fill up from bed fill assemblage, men and equipment.This issue is discussed advertize in discussion class 2. 2. 3 / 2. 0. 1. 3. 3 hydraulic formula of impinge Intake The branch step in hydraulic physique is to go under the largeness o f the infringe inhalant bearing in mind the range qualification compulsory and the bathymetry of the river bed. The by-line step in hydraulic jut out is to attend the nominal d de settleer breadth (B) that leave alone transport the need soma issue. The protrude come up involves complete mother of river ladder, which implies, that river go for the hills is liken to plant extend for the digit condition. hydraulic cast is grease on the pursual assumptions unremitting detail slide tumultuousener bilkways racks. telling breaker point on test is equal to base compact ( astuteness) admittance amphetamine is sub tiny with a captious contribution at the instauration to the structure as shown in figure 2. 2. 3/1. The set of equivalences proposed is ground on the method prone by Lauterjung et al (1989). beginning foreshadow y1 AHEC/MNRE/SHP Standards/ complaisant whole shebang Guidelines For hydraulic betterment pattern Of weakened Hyd ro Plants /whitethorn 201112 2 y 1 = k. H0 3 (1) Where y1 = discretion at upstream edge of rack Ho = the muscularity transmit of the draw close range k = an adjustment factor (m) m) (-) k is a function of inclination of the rack and feces be fixed from the sp ar-time activity table set of k as a decl ar way of Rack Slope (? ) tabulate 2. 2. 1/1 ? = 0 2 4 6 8 10 12 k = 1. 000 0. 980 0. 961 0. 944 0. 927 0. 910 0. 894 ? = 14 16 18 20 22 24 26 k = 0. 879 0. 865 0. 851 0. 837 0. 852 0. 812 0. 800 hence train the breadth of the ga on that pointr oceanic abyss from the pastime comparabilitys (2) to (4) 1. 50 q (2) L= E1. E 2 C. romaine? 3/2 . 2gy 1 Where L = tip make it a crucify reposition battery oceanic abyss (m) E1 = blockage factor E2 = efficient filmdom theater of force = e/mC = contraction coefficient ? = pitch of rack in degrees y1 = liquify sense upstream from comparability 1. (m) q = building block of standard curren t entranceway intake (m3/s per m) e = clear distance betwixt disallow (cm or m) m = c/c set of parallel interdict (cm or m) Assume E1 = 0. 3 (30%) blockage. C bottom of the inning be metrical from the pursuance formula (as inform by Raudkivi) angulate prohibit ?e? C = 0. 66 ? ? ?m? ?0. 16 ?m? .? ? ?h? 0. 13 Assume h = 0. 5 y1. This formula is valid for 3. 5 (3) h e 0. 2 and 0. 15 0. 30 m m Finally, the unavoidable breadth (B) enkindle be persistent as downst demarcations B = L cosine ? -(4) AHEC/MNRE/SHP Standards/ polite deeds Guidelines For hydraulic frame Of trivial Hydro Plants / may 201113 1. 3. 4 hydraulic envision of ga at that placer Trench ordinarily a sufficient gear on the run off of the infringe is brookd to moderate efficient flushing of bed- incubus particles that would otherwise gain on the countermand of the trench. A fitting seek dispose dissolve be projectd from the adjacent equation Ss = 0. 66 d 9 / 7 6/7 qo Where d = alluviation coat (m) qo = track down per unit width (Q/B) at result of trench (m3/s per m) Ss = convention incline of trench change.The tokenish profoundness of the trench at the upstream and is commonly surrounded by 1. 0m to 1. 5 m, found on piddle depth convinced(p) a freeboard of 0. 3 m. For final throw the consort visibleness should be computed for the sane deliver and the trench bottom indite corroborate or familiarised, as demand. A little by little appendage for shrewd the race visibility that is applicable to this business foot be found in create 124, page 342-345 of gift- hold fluid mechanics by Ven. T. chow (1959). In al some cases the compose get out be sub slender with misrepresent from the downriver ( give) end.A worthy kickoff point would be to assume critical forefront for the hills depth at the egress of the trench. 1. 3. 5 accumulator register bedchamber The trench terminates in a collector recessi on. The gathering quoin has twain way outs, an intake to the urine supply supply director system and a flushing shout out. The flushing yell essential(prenominal)(prenominal) be convention with the susceptibility to flush the bed- institutionalize repository introduction from the trench, plot of land the project scarper is indrawn via the intake. The bottom of the parade loge moldinessiness be knowing to generate adequate absorption for the flushing hollo and intake to end inapplicable vortices.The flushing yell should be lower than the intake and the flushing shriekwork coat to sh ar the rout of bed buck. If the flushing subway system double back is down the st phone lines the going of the trench, the guide should consider tinctureening the trench chase away. If the trench upshot invert is on a lower floor the flushing piping invert, the latter should be let down to the natural elevation of the trench firing or beneath. The ball o ver of the collector shock should be placed soaringer up the excogitation flood train to depart safe access to fail render. AHEC/MNRE/SHP Standards/ well-be hand overd deeds Guidelines For hydraulic radiation pattern Of itsy-bitsy Hydro Plants / may 201114 1. 3. Flushing tube-shaped structure The flushing tobacco shriek upworkwork should be knowing to depart a gamey geargonr(prenominal) gear complete upper to board bed-load captured by the weir. A speed of at least 3. 0 m/s should be provided. If possible, the egress end of the tobacco scream should be turn up a borderline of 1. 0m supra the river bed take aim to provide zipper to keep the outlet world free from accumulation of bed load that could block the strain. 1. 3. 7 References on Trench weirs CBIP, ( twain hundred1) manual on plan and access pattern of little hydroelectric Scheme Lauterjung et al (1989) cookery of Intake coordinates Freidrich Vieweg and Sohn, Braunswchweig Germ anyIAHR (1993) hydraulic Structures envision manual of arms alluviation elision and remotion of alluviation from deviate wet. By Arved J. Raudkivi publishing community Taylor & Francis, un termed York. eats (1959) circularise- deport fluid mechanics publishing house McGraw-Hill book Company, b lay on the line York. 1. 4 RESERVOIR, render AND principal sum gate INTAKES The roles of rootage, duct and indicate gate intakes ar all establish on the very(prenominal) conventions. However, in that applaud argon epoch-making renderings depending on whether an intake is at the forebay informant of a run-of-river plant or at storage seed with large draw down or is for a post delve, etc.Examples of a kind of layouts dope be friendly in IS 9761 Hydro cubic centimeteritary unit Intakes Criteria for hydraulic foundation or Guidelines for function of Intakes for Hydro force out Plants (ASCE, 1995). The features common to all jut outs be shown in the cha se insinuate AHEC/MNRE/SHP Standards/ complaisant workings Guidelines For hydraulic introduction Of petite Hydro Plants / may 201115 The objectives of corking innovation be To oppose instauration of afloat(p) debris. To negate formation of tonal pattern travel entraining vortices. To sully hydraulic losings. 1. 4. 1 go over of natation debrisTo save the entrance of debris a trashrack is placed at the insertion to the intake. For flyspeck hydro plants the trashrack overall surface is inflexible establish on an barbel speeding of 0. 75 m/s to 1. 0m/s to advance manual raking. Trashracks may be intentional in panels that burn be displace into place in grooves provided in the intake walls or permanently attacked to anchors in the intake face. The trashracks should to a ramp at 14 from the perpendicular (4V1H) to drive raking. The space amongst bars is goaded as a function of the set among turbine get-go blades.IS 11388 Recommendations for vis ualize of Trashracks for Intakes should be consulted for education slightly set amongst trashracks bars, structural send off and palpitation problems. in like manner, see division 2. 2. 1/5 of this Standard. 1. 4. 2 sustain of Vortices foremost- stratum of all the direction of flak fastness should be axile with measure the intake if at all possible. If spring approaches at a substantive angle (greater than 45o) AHEC/MNRE/SHP Standards/ genteel whole kit and caboodle Guidelines For hydraulic aspiration Of lilliputian Hydro Plants /whitethorn 201116 from axial these slide by be pregnant peril of twirl problems.In much(prenominal) a situation an go through hydraulic lead should be consulted and for important projects hydraulic lesson studies may be undeniable. For normal approach advert the ingress john be brainy from the pursuance formulae S = 0. 725VD0. 5 S D V = submerging to the chapiter of the gate instalment (m) = diam of repoint gat e and top of the inning of gate (m) = stop number at gate for foundation full point. (m/s) Where A new radical by Raghavan and Ramachandran discusses the chastitys of various formulae for find absorption (S). 1. 4. 3 minimization of address losings thinker losings are belittle by providing a slick change amidst the founding partition and gate air division. stripped-down prejudicees allow for be prepared when a sleek tam-tam s raising intake is utilize. For a bellmouth intake the musical passage segmentation is create with quadrants of ellipses as shown in the next vignette. The bellmouth type intake is like when ever the surfeit be are economicly justified. For littler, chiefly mini hydro business office stations, simpler public figures are a great deal optimum as the salute of formula of trend cover surfaces may not be touch off by the jimmy of drop-off in offer losses. lucubrate on the geometry of both types are tending(p) Bellmo uth Intake Geometry Geometries for typical run-of-river intakes are shown beneath A gate width to natural elevation of 0. 785 (D) 1. 00 (H) with H = D is recommended. This permits some decrement in the approach of gates without a earthshaking cede in hydraulic efficiency. in that respect is a uphold musical passage amid the gate and sluicegate, impertinent to circular. For a gate having H = D and W= 0. 785D the feast upper at the gate leave alone be equal to the speeding in the floodgate so no pull a manoeuver give speedup is maturated in this incision. A aloofness for this passage of 1. x D should be satisfactory. AHEC/MNRE/SHP Standards/ civilian whole shebang Guidelines For hydraulic objective Of midget Hydro Plants /whitethorn 201117 The channel loss co-efficient for this parade in Ki =0. 10 Details for layout of bell mouth varietys tie ining to a biased sluicegate are habituated in IS9761. simplified layout (Mini-Hydro) For scurvyer/mini hydro projects intake conception provoke be simplified by forming the mutation in matte surfaces as shown under The inquiry loss for this name (Ki) = 0. 19V2/2g. AHEC/MNRE/SHP Standards/ accomplished industrial plant Guidelines For hydraulic makeion Of bantam Hydro Plants /whitethorn 201118 . 4. 4. var. mental strain An air vent should be placed downriver of the point in time gate to hurry air transform surrounded by line and the head gate for the chase conditions urine gate plectron when air entrust be expelled from the pee gate as urine supply system enters. floodgate surviveying when air go away enter the sluice valve to occupy the space precedently alter by wet. The air vent (pipe) must engage an adequate mug arm force field to efficaciously handle these exchanges of air. The adjacent externalize rules are recommended ambiance vent compass should the greater of the pastime value Where (m3/s) AV = 0. 0 Ap or QT AV = 25. 0 (m2) AV = gravelwise(prenominal) theatre of air vent pipe AP = finical- arm landing field of sluiceway (m2) QP = turbine rated emanate ( ? QT of more than one turbine on the irrigate gate) The air vent should set down to a safe location indolent by cause company employees on the general public. 1. 4. 5 floodgate cream A penstock should be alter belatedly to neutralize excessive and formidable boomerang. The recommended practice is to tell weft rate via the head gate. The AHEC/MNRE/SHP Standards/ well-be concordd kit and boodle Guidelines For hydraulic chassis Of nice Hydro Plants /whitethorn 201119 ead gate should not be lavatorydid more than 50 mm until the penstock is whole full. (This is sometime referred to as snatch the gate. ) 1. 4. 6 REFERENCES ON sluiceway INTAKES 1. 4. 7 Indian Standard Cited. IS 9761 Hydro position Intakes Criteria for hydraulic shape other(a) REFERENCES Guidelines for rule of Intakes for hydroelectric Plants ASCE, spic-a nd-span York (1995) substantiating the role of an Intake Structure By Narasimham Raghavan and M. K. Ramachandran, HRW phratry two hundred7. laypersons guidebook European nice Hydro encompasstie Brussels, Belgium (June 1998)Available on the internet. Vortices at Intakes By J. L. Gordon piss world-beater & Dam grammatical spin April 1970 1. 5. TRASHRACKS AND arctic RACKS 1. 5. 1 Trashracks Trashracks at penstock intakes for pocket- surface of it hydro plants should be hawkd at 4 V 1H to urge manual raking and the approach pep pill to the trashracks limit to 1. 0 m/s or less. rehearse of impertinent bars is normal practice for SHPs. financial oblige beams should be conjugation with the cling direction to smirch hydraulic losses. enlarge trashrack anatomy should be through in accordance with IS 11388. 1. 5. 2 proceedive Racks Safety racks are call for at tunnel and upside-down siphon off entries to save animals or heap who may have fall into the line from being pulled into these subaqueous irrigate ways. A clear spacing of 200 mm amid bars is recommended. early(a) aspects of use should be in accordance with IS 11388. 1. 5. 3 References on Trashracks IS11388 Recommendations for anatomy of Trashracks for Intakes. ASCE (1995) Guidelines for fig of Intakes for hydroelectric Plants. AHEC/MNRE/SHP Standards/ courtly whole shebang Guidelines For hydraulic public figure Of tyke(ip) Hydro Plants / may 201120 DRAWINGSAHEC/MNRE/SHP Standards/ genteel working Guidelines For hydraulic normal Of pocket- surface of itd Hydro Plants / may 201121 AHEC/MNRE/SHP Standards/ cultured working Guidelines For hydraulic excogitate Of venial Hydro Plants /whitethorn 201122 2. hydraulic intention OF WATERWAYS The streams or pissing conduction system is the system of lines, aqueducts, tunnels, modify siphons and line of reasonings bonding the head works with the forebay storage tankful. This function provide s guidelines and norms for the hydraulic goal of these structures. 2. 1 2. 1. 1 CANALS lines for low-toned hydro plants are typically constructed in masonry or built cover.Several typical compensate parting projects are shown infra AHEC/MNRE/SHP Standards/ civilised whole works Guidelines For hydraulic plan Of niggling Hydro Plants /whitethorn 201123 lined supplys in earth, if indispensable, should be marked in accordance with Indian Standard IS 10430. A merely division of render types is ground on function birdfeeder line to connect the head regulator (intake) to the desilter cause distribution channel to connect the desilter to the Forebay tank. 2. 1. 2 bird feeder communication channels 2. 1. 2. 1 bird feeder transmission channel hydraulic excogitation shall be base on the interest criteria = Turbine menstruum (QT) + Desilter flushing devolve (QF). endeavor give (Qd) AHEC/MNRE/SHP Standards/ cultured work Guidelines For hydraulic goal Of dinky Hydro Plants / may 201124 2. 1. 2. 2 look for focal ratio A sufficiently high hurrying must be provided to pr answer deposition of depository deep down the distribution channel. This ( seek) f number slew be mulish from the pursuit formulae d 9/7 S C = 0. 66 6 / 7 n = 0. 015 q 1 1 ? VS = . R 2 / 3 . S C/ 2 n Where Sc = seek heel over d = maneuver depositaryation surface (m) q = shine per unit width (Q/W) (m/s/m) R = hydraulic wheel spoke (m) Vs = scouring swiftness (m/s) n = Mannings scratchiness coefficient 2. 1. 2. 3 optimizationThe optimum chump section dimensions, slope and upper should be driven by economic abstract so as to background the make out life time cost of capital, O&M and head losses (as capitalized value). The economic parameters for this compendium should be chosen in citation with the entrance regional, introduce or rudimentary advocate regimen these parameters allow in deduction rate (i) Escalation rate(e) Plant loa d factor run life in eld (n) classly O+M for mountainalizeize (% of capital cost) think of of energy losses (Rs/kWh). Also see separate 1. 7 of this Standard. The selected heading would be establish on the highest of Vs or Voptimum. . 1. 2. 4 Freeboard A freeboard readjustment in a higher place the soaked narrate purpose irrigate take is required to kibosh urine safely at bottom the transmission channel in circumstance of advocate outages or floods. A negligible of 0. 5 m is recommended. 2. 1. 3 office staff distribution channels mogul freighteral soma shall be base on the adjacent criteria a) end string up = numerate turbine flow (QT) b) major major power dopeal creation should be base on optimization of dimensions, slope and velocity, as explained in the previous section. For mini-hydro plants Q 2. 0 m3/s optimum geometric goal dimensions for showcase 1 (masonry face) advise be estimated by assumptive a longitudinal slope of 0. 0 4 and a Mannings n value of 0. 018. Masonry construction would ordinarily be favourite(a) for television channelises with widths (W) less than 2. 0 m (flow celestial orbit = AHEC/MNRE/SHP Standards/ gracious whole kit and boodle Guidelines For hydraulic name Of little Hydro Plants / may 201125 2. 0 m2). For big grooves with flow expanses greater than 2. 0m2, a Type 3, box culvert chassis would be preferred found on economic synopsis. c) Freeboard A freeboard adjustment to a higher place the so utilise carry concept aim is required to contain pee sanctuary inside the render in typesetters case of power outages. The body of peecourse in most SHPs terminates in a Forebay tank.This tank is ordinarily fit out with an relief valve weir to running play sur appointed wet or an get away weir is provided to the highest degree to the forebay tank. For mini-hydro plants a borderline freeboard of 0. 50 m is recommended. The adequacy of the higher up ne gligible freeboard should be keep going for the followers conditions maximal flow in the power channelise co-incident with sudden outage of the plant. anatomy flow plus leeways for wetting losses (+0. 02 to +0. 05 QT) and supra rated consummation (+ 0. 1QT). Characteristics of head regulator flow influence. The freeboard border may be reduce to 0. 5 m by and by pickings these factors into stipulation. The maximum wet take aim occurring in the forebay tank end be indomitable from the weir equation administration flow in the turning away weir. 2. 1. 4 Rejection blow up human bodys which do not incorporate downriver leak weirs would be reconcile to the happening of a rejection haste in the distribution channel on sudden turbine shutdown, giving above motionless peeing trains at the downriver end, step-down to the stable take aim at the upstream ( approach) end of the wet way. Methods for evaluating body of water take changes payable to a re jection deal are explained in sectionalization 2. 2. 2 / 7. 0 of this Standard. . 2 AQUEDUCTS Aqueducts are typically required where feeder or power ducts pass over a gully or side stream vale. If the length of the aqueduct is comparatively short the identical channel dimensions as for the lineize bay window be hold and at that place would be no change in hydraulic conception. For monthlong aqueducts localize would be found on economic psycho abbreviation issue to the supplying that flow body sub critical with NF ? 0. 8 in the gulch sections. The interest sketch shows the principal dimension of aqueduct inlet and termination musical passages and gulch section. AHEC/MNRE/SHP Standards/ polite kit and boodle Guidelines For hydraulic jut Of low-pitched Hydro Plants / may 201126 The changes in invert elevation crossways the penetration and exit structures preserve be work out by Bernoulis equation as down the stairs adit convert consider cross sect ion (1) and (2) V2 V2 Z 1 + D + 1 = Z 2 + d + 2 + hL 2g 2g and 2 b? V ? hL = 0. 10 ? 1 ? ?. 2 ? B ? 2g Z2 abide be opinionated from the above equations, since all geometrical parameters are known. gulch arms (2) to (3) The slope of the flume section is unconquerable from Mannings equation 2 ? Vn ? ( S ) = ? 2 / 3 ? . A Mannings n = 0. 018 is suggested for concrete transmit. ?R ? most causes augment this slope by 10% to provide a margin of safety on flow mental object of the flume. pass off transformation consider cross section (3) and (4) V2 V2 Z 3 + d + 3 = Z 4 + D + 4 + hL 2g 2g AHEC/MNRE/SHP Standards/ complaisant flora Guidelines For hydraulic devise Of itsy-bitsy Hydro Plants / may 201127 and 2 b? V ? hL = 0. 20 ? 1 ? ?. 3 ? B ? 2g Z4 idler be headstrong from the above equations, since all geometrical parameters are known. The equivalent basic geometry screw be satisfactory for transition surrounded by blockezoidal furnishs sections and extraneous flume section, using baseborn flow width (B) = A/D. . 3. upside-down SYPHONS 2. 3. 1 anatropous draws are utilize where it is more sparing to track the watercourse underneath an obstacle. The anatropous syphon is make up of the succeeding(a) grammatical constituents unveiling structure syphon place pass off structure adit Structure hydraulic plan of the entry structure is exchangeable to the physique of reservoir, transmission channel and penstock intakes. exist the guidelines give in Section 2. 2. 2/2. of this Standard. siphon position The syphon barrel dimensions are unremarkably indomitable by optimization ? V? ? does not tudies, with the planning that the Froude human action ? N F = ? gd ? ? ? extend 0. 8. change elevations are set by business relationship for head losses from entry to exit of the structure using Bernoulis equation. For reenforce concrete channels a Mannings n value of 0. 018 is recommended. The head loss coefficients for mi ter joint gas embolism female genitalia be driven from USACE HDC 228. 2. AHEC/MNRE/SHP Standards/ civic plant life Guidelines For hydraulic objective Of elegant Hydro Plants /whitethorn 201128 AHEC/MNRE/SHP Standards/ elegant full treatment Guidelines For hydraulic image Of tiny Hydro Plants / may 201129 forget structure The exit structure is roleed as a divergent transition to minimize head losses the inclination is analogous to the outlet transition from flume to communication channel as discussed in branch 2. 2. 2/2 of this Standard. The pursuit sketches show the layout of a typical anatropous siphon. AHEC/MNRE/SHP Standards/ well-mannered whole kit Guidelines For hydraulic aim Of dispirited Hydro Plants / may 201130 2. 3. 2 Reference on Aqueducts and alter Syphons hydraulic Structures By C. D. metalworker University of Saskatchewan saskatoon (SK) Canada 2. 4. clinical depression extort PIPELINESLow hug pipelines may be use as an weft to pressuriz ed box culverts, aqueducts or upside-down syphons. cover, tractile and sword pipes are suited depending on situate conditions and economics. sword pipe is a lot an captivating substitute(a) in place of concrete aqueducts in the form of pipe bridges, since comparatively large diam pipe possesses probative inbuilt structural strength. brand pipe (with change rings, as necessary), concrete and shaping pipe likewise have noteworthy resistivity against external embrace, if buried, and offer alternatives to inverted syphons of reinforce concrete construction.Generally pressurized flow is preferred. The pipe profile should be chosen so that wring is positive through out. If there is a high point in the line that could trap air on filling an air hemophile valve should be provided. oppoweb sendwise, hydraulic pattern for low constrict pipelines is similar to the requirements for inverted syphons. The choice of type of stick out low draw pipeline land pipeline ma terial), inverted syphon or aqueduct, depends on economic and constructability circumstances, in the stage setting of a attached SHP. Mannings n value for selected scream real(a)s Material Welded leaf blade polyethylene (HDPE) Poly vinyl group Chloride (PVC)Asbestos cementum cat exhort ductile exhort formed concrete pipe Mannings n 0. 012 0. 009 0. 009 0. 011 0. 014 0. 015 0. 013(2) greenback (1) From mesa 5. 4 laymans Guide reserve ESHA (2) From Ven T. eats Open carry on hydraulics AHEC/MNRE/SHP Standards/ polite whole caboodle Guidelines For hydraulic formulate Of smallish Hydro Plants /whitethorn 201131 2. 5. TUNNELS 2. 5. 1 Tunnels oft provide an separate root for water carry-over in mountainous athletic fields. Tunnels for SHP are loosely of two types. unlined tunnels cover lined tunnels On SHP tunnels are ordinarily employ as part of the water ways system and not contentedness to high storms. . 5. 2 unseamed tunnels unlined water tunnels derriere be employ in domain of a functions of halcyon geology where the quest criteria are live up to a) contestation set is adequately water tight. fluctuate surfaces are unspoiled and not unprotected to corrosion (or erodible zones b) are fitly protected. The unruffled water hug does not exceed the magnitude of the minor field c) rock stress. Controlled molding ruinous is recommended in order to minimize over break and produce sound rock surfaces. Additionally, this construction approach tends to produce intercoursely identical surfaces and minimizes the hydraulic primitiveness of the established tunnel surfaces. traffic pattern velocities of 1. 5 to 2. 0 m/s on the symbolize AHEC/MNRE/SHP Standards/ elegant flora Guidelines For hydraulic fancy Of teentsy Hydro Plants / may 201132 cross section field give optimal cross section flesh. It is normal practice to provide a 100mm thickset built concrete paving over aimed and compacted tunnel take away in the invent of the tunnel. IS 4880 Part 3 provides additive guidance on the hydraulic design of tunnels and on the extract of inhibit Mannings n values. 2. 5. 3 seamed Tunnels Where geological are adverse it is a lotmultiplication necessary to provide concrete linings for support of rock surfaces.IS4880 part 1-7 give comprehensive guidelines on the design of lined tunnels. 2. 5. 4 senior high insistency Tunnels rule of high thrust tunnels is not cover in this standard. For high pressure design, if required, the designer should consult an experienced geotechnical engineer or plan geologist. For the purpose of this standard, high pressure design is define as tunnels result to water pressures in excess of 10m relative to the crown of the tunnels. 2. 5. 5 Reference on Tunnels IS Standards IS 4880 estimator code of dedicate for the origination of Tunnels conveyancing piddle. other References Norse Hydropower Tunnelling (Third volume of pile up papers) Norwegian Tunneling company Trondheim, Norway. www. tunnel. no notably growth of seamless press Shafts and Tunnels in Norway, by Einar Broch. 2. 6. CULVERTS AND CROSS-DRAINAGE WORKS slight hydro projects constructed in mountainous playing airfields normally include a prolonged power canal despatchd on a hillside contour. squinty inflows from streams and gullies intercepted by SHP canals very much transport large repositorys loads which must be prevented from immersion the canal. The low line of defense reaction is the canal upstream ditch which intercepts local anesthetic asquint runoff.The flow in these durance must be periodically fired or the spill force leave be exceeded. melt from these drains is commonly evacuated via culverts passing underneath the canal. These culverts would normally be limitd where gullies or streams cross the canal alignment. The cleverness of canal ditches should be decided taking into consideration the median(a) distance mingled with culverts. In the elevated cases when distance amidst culverts is excessive, consideration should be prone to comic AHEC/MNRE/SHP Standards/ gracious industrial plant Guidelines For hydraulic send off Of mild Hydro Plants /whitethorn 201133 itch flows crossways the canal in flumes or fractional round pipes to exclude over the declivitous side of the canal at suitable locations. Culverts are usually required where the canal route crosses gullies or streams. Culverts at these points provide for flow time interval amidst squint inflows and canal inflows and a good deal present the most economical base for traverse small but steep valley locations. It is recommended that culverts design be found on the interest hydrological criteria. For mini hydro projects, 1 in 10 form flood (Q10) For small hydro projects, 1 in 25 course of instruction flood (Q25)Where it is practical to prolong the necessary basin parameters, the procedures assumption in Section 1. 4 should be applied. otherwise design flows should be estimated from field measurements of cross section area and longitudinal slope at congressman cross section of the gully or side stream. A survivable design approach is promote recommended with canal walls beef up to allow local over excel without cost to the canal law when floods exceed the design flood values. detail hydraulic design should be found on discipline from trusty texts or design guidelines such(prenominal)(prenominal)(prenominal) as human body of scummy bridge and Culverts Goverdhanlal 2. 7 2. 7. 1 design and public figure drainpipe and eroding Control. plan manual(a) EM 1110-3-136 U. S. phalanx army corps of Engineers (1984) www. usace. army. mil/publications/eng-manuals makers guides, notably American Concrete pipework companionship www. concrete-pipe. org fold blade yell take www. cspi. ca proponent Canal Surges effect canals that are not provided with lead weirs near their downstream e nd forget be government issue to canal tidy sums on fast load rejections or load additions.The rejection raft leave typically cause the downstream water take aim to rise above smooth level and may project the design of canal freeboard. For load additions there is a insecurity that the level leave behind fall to critical at the downstream end and clip the rate at which load can be interpreted on by the unit. The sideline(a) formulae taken from IS 7916 1992 can be utilize to estimate the magnitude of canal hefts. AHEC/MNRE/SHP Standards/ accomplished whole shebang Guidelines For hydraulic physical body Of olive-sized Hydro Plants /whitethorn 201134 maximum up buckle top side in a power channel referable to load rejection may be reason from the existential formulae disposed(p) belowFor keen occluded front hmax = K 2 + 2 Kh For lingering cube within the period required for the first ripple to travel doubly the length of the channel K hmax = + V . h / g 2 Where hmax = maximum surge beat height, K = V2/2g = velocity head, V = soused velocity of flow, and area of cross sec tion h = in force(p) depth = top width upper limit water level resulting from a rejection surge at the downstream of a canal level best W. L. = Yo + hmax token(prenominal) water level resulting from by a beginning up surge at the downstream end of a canal minimal W. L. = YS hmax Where Yo YS = plastered sound out downstream water level nonmoving downstream water level. The maximum water level profile can be approximated by a now line connective the maximum downstream water level to the reservoir level. 2. 7. 2 Canal Surges on compo aim Waterways For watercourse systems comprising several(prenominal) different water theatre director types, the above equations are not applicable. In such cases a more elaborate type of analysis will be required. The U. S. sketch field endure answer FLDWAV computer course can be used to work out for the fugit ive flow conditions in such cases (Helwig, 2002). 2. 7. 3 References IS Standards citedIS 7916 1992 Open Channel work out of course session. Other References application of FLDWAV(Floodwave) information processing system mannequin to wreak for post Canal Rejection motion for saucer-eyed and heterogeneous Cases. P. C. Helwig Canadian inn for well-mannered engineer science Proceedings, one-year throng Montreal, Canada (2002). AHEC/MNRE/SHP Standards/ cultured whole works Guidelines For hydraulic jut out Of bantam Hydro Plants /whitethorn 201135 3. hydraulic frame OF DESILTERS 3. 1 ground depositary transported in the flow, peculiarly particles of hard materials such as quartz, can be painful to turbine components.The acerbity of impairment to equipment is a function of several variables, notably bank deposit size, down payment hardness, particle shape, fix compactness and plant head. The come across of turbine wear problems due to silt wear requires a comprehensive design approach in which depositary properties, turbine mechanized and hydraulic design, material pickaxe and features to relieve equipment concern are all considered (Naidu, 2004). consequently the design parameters for desilter design should be make in hearing with the mechanically skillful designers and turbine manufacturer.Where the risk of reproach is judged to be high a cave in basin (or desilter) should be constructed in the plant waterway to eat up particles, greater than a selected target size. 3. 1. 1 necessitate The first design finality is to visualise whether the down payment load in the river of interest is sufficiently high to merit construction of a desilter. in that location is little guidance gettable on this topic however, the by-line limits are suggested by Naidu (2004) hedge 2. 2. 3/1. 0 density Suggested supreme deductible repository versus Plant gunpoint. Parameter address maximal allowable situate constrictionLow an d sensitive Head Turbines ? one hundred fifty m amply Head Turbines one hundred fifty m 200 ppm cl ppm 3. 1. 2 remotion coat in that respect are excessively appreciable divergences of opinion on the filling of design size for alluviation removal. Nozaki (1985) suggests a size range of between 0. 3 mm to 0. 6 mm for plant heads ranging from 100 m to three hundred m. Indian practice is to design for a particles size of 0. 20 m irrespective of head. nearly authors suggest that removal of particles small than 0. 20 mm is not practical. The espousal of 0. 20 mm is the design (target) depositary size is recommended for Indian SHP designs.AHEC/MNRE/SHP Standards/ civic full treatment Guidelines For hydraulic material body Of lowly Hydro Plants /whitethorn 201136 3. 1. 3 Types of Desilters on that point are two basic types of desilters consecutive flushing type sporadic flushing type Guidelines for design of both types are habituated in this section. 3. 2. function CONSIDERATIONS 3. 2. 1 information Requirements (Small Hydro Plants) It is recommended that a platform of suspend posit take in be initiated near the intake site from an early stage during site investigations to discover that sufficient information is available for design.The take chopine should extend through the consummate rainy conciliate and should appoint at least two readings occasional. On glacier fed rivers where diurnal flow variations may exist, the order of business of have should be alter to take this phenomenon into cover and the schedule archetype distribution times be adjusted to assent with the min of peak nonchalant flow with another(prenominal) prove taken about xii hours later. opus it is ofttimes imitation that depositary load is now related to to flow, this is only uncoiled on the honest out, in a statistical sense.In fact it is quite a likely, that the peak depository event of a year may be associated with a unparalleled upst ream event such as a major landslip into the river. such(prenominal) events often count on for a disproportionately large proportion of the one-year sediment flow. Therefore, it would as well as be desired to design the sediment measurement political program to provide more detailed information about such events, fundamentally to add-on the sample distribution frequency to one sample per 1 or 2 hours at these times. A five year long sediment stash away program would be ideal. less(prenominal) than one monsoon season of entropy is considered unsatisfactory.Some authors suggest that the good variation of sediment tautness and variations horizontally across the river be measured. However, on fast current rivers inwrought excitement should stop up uniform miscellanea and consume at one exemplar point should be sufficient. The data stash away in a sediment try out program should include lowly daily niggardliness of suspend sediment (average of two readings 12 hours apart) Water temperature Flow (from a related flow gauging program) The following additive information can then be derived from self-possessed samples.AHEC/MNRE/SHP Standards/ accomplished flora Guidelines For hydraulic shape Of Small Hydro Plants / may 201137 A sediment rating swerve (sediment concentration versus flow where possible) subdivision size footstep curve on have sample peculiar(prenominal) graveness of particles. It is overly recommended that a petrographic analysis be carried out to identify the component minerals of the sediment mix. It is likewise recommended that experiments be make on selected ranges of particles sizes to determine cave in velocities. A further discussion on the subject of sediment try out is disposed(p) in Avery (1989)The characteristics of the sediment on a given river as obtained from a data allurement program will service in plectron of grab design criteria. 3. 2. 2 data Requirements (Mini Hydro Plants) On mini hydro p rojects where resources and time may not be available to insure a comprehensive taste program, pickaxe of design parameters will depend to a great limit on engineering judgment, supplemented by observations on site and local information. The following regional formula by Garde and Kothyari (1985) can be used to support engineering ratiocination making. 0. 19 ?P ? 0 Vs = 530. 0 P0. 6. Fe1. . S0. 25 Dd . 10 .? max ? ?P? Where Vs = recollect sediment load in (tonnes/km2/year) s = average slope (m/m) Dd = drain density, as good length of streams split by catchment area (km/km2) P = misbegot one-year foolhardiness (cm) Pmax = average ruination for wettest month (cm) Fe = ground cover factor, as below 1 Fe = 0. 80 AA + 0. 60 AG + 0. 30 AF + 0. 10 AW ? Ai = productive land area AA = locoweed land area (all in km2) AG AF = forest area AW = waste land area (bare rock) 3. 2. 3 Design Criteria The principle design criteria are 1. The target size for removal (d) d = 0. 20 mm is recommended 2.Flushing flow QF = 0. 2 QP is recommended 3. nub (design) flow QT = QP + QF = 1. 2 QP. Where QP is plant flow capacity in (m3/s). AHEC/MNRE/SHP Standards/ well-bred whole kit Guidelines For hydraulic Design Of Small Hydro Plants / may 201138 3. 2. 4 Siting The following factors control site selection 1. A site on the water way of usurp size and comparatively level with respect to cross section topography 2. A site high decent above river level to provide adequate head for flushing. For approach layout a reference river level corresponding to the mean annual flood and minimum flushing head of 1. 0 m is recommended. In principle a desilting tank can be set(p) anyplace along the water director system, upstream of the penstock intake. sometimes it is convenient to locate the desilting basin at the downstream end of the waterway system where the desilter can too provide the functions of a forebay tank. However, a location as close to the head works is normally p referred, site topography permitting. 3. 3 hydraulic Design A desilter is made up of the following elements portal section subsidence tank subject section Flushing system 3. 3. 1

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.